San Francisco - Oakland Bridge EXACT SEQUENCE UNTIL BIG ONE
Let's consider that all the dates presented below are correspondingly linked to a future destructive event such as the great California earthquake in 2025. Keep in mind the esoteric and real meaning of the numbers that the great manipulative elites of world events use to sequence and align certain events with others. Similarly, astrology is used by those who control the material plane to perform certain geopolitical and social maneuvers, just as they exploit astrological influences to their advantage, because they know better than anyone that the planets control events on Earth.
The San Francisco-Oakland Bay Bridge, commonly known as the Bay Bridge, is a complex of bridges that spans San Francisco Bay in California. As part of Interstate 80 and the direct route between San Francisco and Oakland, it carries around 260,000 vehicles a day on its two levels. It includes one of the longest bridge spans in the United States.
Important Dates for the Bridge:
- Construction Start: July 9, 1933
- Inauguration: November 12, 1936
- Bridge Temporarily Closed for East Span Replacement: August 28, 2013
- Cosco Busan Oil Spill: November 7, 2007
- Public Installation of "Light Sculpture": March 5, 2013
- Alexander Zuckermann Bike Lane: September 3, 2013
- Yerba Buena Tunnel Closure and Repair: January 30, 2016
Start of Bridge Construction
The toll bridge was envisioned during the California Gold Rush days, with the famous "Emperor" Joshua Norton advocating for its construction, but work did not begin until 1933. Designed by Charles H. Purcell.
Time Between the Start of Bridge Construction and July 11, 2025, Predicted Date of the Big One:
- 92 years, 0 months, and 2 days (Sequence 9.2.2) + Number 911 Symbolism of Danger.
- 33,605 days (The reduced sequence forms the number 3311, indicating clear symmetry).
Astrology indicates an alignment of Mars at 14° with the great earthquake coinciding with Jupiter in Virgo, suggesting a dangerous conjunction between the destructive Mars and expansive Jupiter. The Sun at 19° Cancer is exactly in the position of the natal Pluto. Mercury marks alignment in the same position as the date construction of the structure began, showing a significant coincidence. Natal Mars is in exact opposition to the powerful conjunction of Neptune and Saturn at 2° Aries.
Inauguration of the Bridge
Built by American Bridge Company, it was inaugurated on Thursday, November 12, 1936, six months before the Golden Gate Bridge.
Time Between the Bridge Inauguration and July 11, 2025
- 88 years, 7 months, and 28 days (The sequence shows a symmetry in the pattern of triple 8)
- 32,383 days (The sequence becomes symmetrical, showing the number 3 exactly three times).
Cosco Busan Oil Spill in 2007
Time Between the Oil Spill and July 11, 2025
In 2007, a container ship named Cosco Busan, later renamed Hanjin Venezia, collided with the Delta Tower's fender, causing the Cosco Busan oil spill. Notably, the date of this accident numerically matches the date of the great earthquake, occurring on November 7, 2007, which numerically corresponds to July 11, 2025. Both dates are 11.7.9.
- 17 years, 8 months, and 4 days (Adding 1 to 7 results in 8, and the pattern becomes 100% even)
- 6,456 days (The total number of days until the event forms a symmetrical sequence if we sum 5 + 4 = 9, the numbers simply complement each other).
Replacement of the East Span
The original eastern section was permanently closed to traffic on August 28, 2013, and the replacement span opened to traffic five days later. The original eastern section was dismantled between January 2014 and November 2017.
Time Between the Temporary Bridge Closure and July 11, 2025
- 11 years, 10 months, and 12 days (The sequence shows numerology with the symbolic number 33, indicating to the initiated the danger of the great earthquake date). The pattern also shows the triple number 1 if reduced correctly.
Public Installation of "The Bay Lights" Art
On March 5, 2013, a public art installation called "The Bay Lights" was activated on the vertical cables of the western span. The installation, designed by artist Leo Villareal, consists of 25,000 LED lights originally scheduled to be on display every night until March 2015. However, on December 17, 2014, the nonprofit Illuminate The Arts announced it had raised the $4 million needed to make the lights permanent; the display was temporarily turned off in March 2015 for maintenance and to install more durable bulbs and was turned back on January 30, 2016.
Time Between the Light Sculpture Installation and July 11, 2025
- 12 years, 4 months, and 6 days (The complete and individual sequence shows the Masonic and Kabbalistic number 22, which divides into 11, a symbolic number of evil).
- 4,511 days (The sequence 9.11 is present, showing that the earthquake date should be correct).
Alexander Zuckermann Bike Lane
The pedestrian and cyclist route in the eastern section opened on September 3, 2013, and is named after Alexander Zuckermann, founding president of the East Bay Bicycle Coalition. This forms a cross-bay route for the San Francisco Bay Trail. Until October 2016, the path did not connect with the sidewalks of Yerba Buena and Treasure Island due to the need to demolish more of the old eastern section before final construction. On May 2, 2017, public access was extended to seven days a week, from 6 a.m. to 9 p.m., with occasional closures for continued demolition of the old bridge's foundations. This work was completed on November 11, 2017.
Time Between the Opening of the Bike Lane and July 11, 2025
- 11 years, 10 months, and 8 days (The sequence shows a clear numerical alignment with high symmetry; summing all the numbers individually results in 11, symbolizing the dualistic principle of all evil in the world).
- 4,329 days (The number 7.11 appears, showing the date of the Big One).
Yerba Buena Tunnel Closure and Repair
On January 30, 2016, a piece of concrete the size of a car tire fell from the tunnel wall onto the slow lane of eastbound traffic on the lower deck of the Yerba Buena Tunnel, causing a minor accident.
Time Between the Tunnel Closure and Repair and July 11, 2025
- 3,450 days (The numerical sequence seems to align in a ladder pattern 3,4,5).
As we can see, all the dates related to the bridge are aligned with a future destructive event, possibly in 2025, with the first date showing a significant position for the Big One earthquake.


Comments
Post a Comment